JOINTING GUILDLINES FOR TERRALINE RING-FIT(RF) PIPES,FITTING AND ACCESSORIES

  • Cut pipe Straight, Inspect the pipe end throughly after cutting and ensure that there is no crack at the mouth portion of the pipe. if Crack noticed cut off a minimum 25mm beyond the visible crack before proceding
  • Chamfer the spigot end of pipe to 15 degree and remove all burrs.Burr will score the channel & Obstruct the flow of Water discharged & damage the DM seal during installation.
  • Use a clean and dry cloth to wipe of the dirt,rain water &moisture on the surface of the pipe.Also clean the dirt from inside the socket portion of the fitting & DM Seal
  • Check the socket end for DM Seal.Ensure that the arrow mark on the DM Seal is toward the outside of the Socket
  • Apply Ajay Drainline make lubricant on the spigot end of the pipe.
  • Immediately insert pipe into fitting socket.Rotate the pipe slightly while inserting.pull out the pipe 10mm away from the socket. The gap will allow the pipe to expand without disordering the pipe-work joint

JOINTING GUIDLINE FOR TERRALINE SOLVENT-FIT(SF) PIPES,FITTING AND ACCESORIES

  • Cut the pipe straight.Inspect the pipe end throughly after cutting and ensure that there is no crack at the mouth portion of the pipe.If crack is noticed cut off the minimum 25mm beyond the visible crack before proceeding
  • Chamfer the spigot end of pipe to 15 degree and remove all burr.Burr will score the channel & Obstruct the flow of Water discharged & damage the DM seal during installation.
  • Use clean and dry cloth to wipe of the dirt,rain water & moisture on the surface of the pipe.Also clean the dirt from inside the socket portion of the fitting & DM Seal
  • Check the dry fitment of pipe.It should easily go 2/3 of the socket portion of fitting
  • Apply thin coat of Ajay Terraline regular-bodied Solvent cement into the the fitting socket & on the spigot end of the pipe.Do not puddle cement into the socket
  • Insert pipe into the socket immediatly adn rotate 90 degree while it is in wet condition.Make sure pipe goes all the way to bottom of fitting
  • Hold the pipe and fitting together{30 sec approx} to make sure that pipe doesn't push out
  • Wipe of excess cement with clean and dry cloth & allow it curing